Dunbar Phase II by Total Oil Marine

In late 1999, a Poseidon multiphase pump was installed on the Dunbar field, as the final part of Dunbar Phase 2. This will increase recoverability and extend field life.

Dunbar Phase II, North Sea, Total Oil Marine, Europe(North),