The Cannonball field development provides gas for Atlantic LNG Train 4. First production started in 2006 at a rate of ca 800 mmscfd (140mboed) from 3 development wells.
The Cannonball platform was a major milestone both for BPTT and Trinidad and Tobago. It was the first in-country platform fabrication, delivering a significant step change in local content and enabling the development of a sustainable local platform fabrication industry. The Cannonball development also established the foundation for the current design and fabrication for future New Field Developments via standardized normally unmanned installations in Trinidad. Standardisation reduces both cycle time and costs.
Cannonball, Trinidad and Tobago, BP, America(North),
More Subsea Oil and Gas Companies, Products, Projects, Drilling Rigs and Jobs
- Directional Drilling Quick Guide: What is directional drilling and how to get directional drilling jobs! What is Directional Drilling? Directional drilling or deviation drilling is an oil and gas exploration drilling technique used to change the direction…
- List of Oil and Gas Companies in Dubai, UAE The oil and gas companies are in Dubai, which is located at the southern end of the Persian Gulf, between Abu Dhabi and Sharjah, in the Arabian Desert. A small area belonging to Dubai, Al…
- Underwater Welding Quick Guide: What is underwater welding and how to get underwater welding jobs! What is Underwater Welding? Underwater welding, a term for methods adapted for subsea welding, for the purpose of repairing damage to ships…