Valhall Flank Water Injection Platform by BP

⚡ AI-Powered Subsea Engineering DNV · NORSOK · ASME code checks in hours, not weeks esubsea.ai →


field was discovered in 1969 and came onstream in 1982. It is operated by BP (28.09%) on behalf of Amerada Hess (28.09%), Enterprise (28.09%) and TotalFinaElf (15.72%).

Valhall Flank Water Injection Platform, North Sea, BP, Europe(North),

⚡ AI-Powered Subsea Engineering DNV · NORSOK · ASME code checks in hours, not weeks esubsea.ai →