Search results for "BP"
Results 1 - 15 of 133
|
Page 1 of 9
|
Sorted by: Relevance | Sort by: Date
|
Results per-page: 10 | 20 | 50 | All
|
[…]vacancies, jobs and BP Norge AS careers! We are located in Stavanger, Norway, Europe(North) www.bp.no BP Norge AS Products BP Norge AS Vacancies Top Oil and Gas Jobs in Norway Top Oil and Gas Jobs in Stavanger Top BP Norge AS Job […]
[…]Dog, Holstein and Atlantis fields. Mardi Gras Oil and Gas Transportation System, Gulf of Mexico, BP, […]
[…]phase 1 of the Clair oil and gas field at a cost of around £650 million (pounds).
BP with 28.6% of the share operates the field. Other partners include Chevron UK 19.4%, Conoco 24.0%, Enterprise Oil 18.7% and Amerada Hess 9.3%. Clair, North Sea, BP, […]
[…]The deep water field lies in Mississippi canyon blocks 126 and 127. Horn Mountain, Gulf of Mexico, BP, […]
[…]adjacent to the Mad Dog and Atlantis fields. Holstein Oil and Gas Development, Gulf of Mexico, BP, […]
[…]98% of the methanol is recycled. When offshore processing is completed, the gas will flow via BP’s existing 90cm pipeline to its terminal at Dimlington, where final processing will take place. Easington Catchment Area (ECA), North Sea, BP, […]
[…]lies in 400m of water and it extends across four blocks. Schiehallion Oil Field, North Sea, BP, […]
[…]is currently under development, with first gas expected in 2009. Savonette, Trinidad and Tobago, BP, […]
pipeline development is part of an integrated initiative to develop BP’s gas resources from the East coast of Trinidad and Tobago. Bombax Pipeline Development, Trinidad and Tobago, BP, […]
[…]126-127, approximately 84 mile south of Venice, Louisiana. Horn Mountain NWFX, Gulf of Mexico, BP, […]
field was discovered in 1969 and came onstream in 1982. It is operated by BP (28.09%) on behalf of Amerada Hess (28.09%), Enterprise (28.09%) and TotalFinaElf (15.72%). Valhall Flank Water Injection Platform, North Sea, BP, […]
[…]including $3 billion for the BTC export pipeline. Azeri-Chirag-Gunashli (ACG) Oil, Azerbaijan, BP, […]
[…]3 development wells.
The Cannonball platform was a major milestone both for BPTT and Trinidad and Tobago. It was the first in-country platform fabrication, delivering a significant step change in local content and enabling the development of a sustainable local platform fabrication industry. The Cannonball development also established the foundation for the current design and fabrication […]
[…]Estimated reserves at Shah Deniz exceeds 400 million cubic meters of gas Shah Deniz, Caspain Sea, BP, […]
[…]is 4,500ft and the field runs along the Sigsbee Escarpment. Mad Dog Drilling Unit, Gulf of Mexico, BP, […]