[…]for many applications increases, SCE developed a range of standard, dry-mate, fiber optic, hybrid connectors. The Opti-Con series is available in 5 shell sizes from 1 to 20 contact configurations and has a pressure rating of 7,500 psi (5,200m water depth). This connector range offers fully interchangeable electric or optic contacts and can be oil […]
[…]portfolio. As an OEM supplier, the company sets global standards in the field of electrical connection technology. The Weidmüller product portfolio ranges from terminal blocks, PCB connectors and terminals, protected components and relay sockets to power supply and overvoltage protection modules suitable for all applications. Electrical installation and marking material, basic I/O components and a […]
[…]with the Clients Representative, vessel/installation Master/OIM, Diver Supervisor, ROV Personnel do that all concerned understand the propose of the operation, and the proposed methods of achieving its completion
* Ensuring that all equipment and stores used by the operations team are in conditions satisfactory in performance, maintenance and calibration necessary to carry out the operation.
[…]
[…]natural gas pipeline has the capacity to transport up to 200 million cubic feet per day by connecting the fields to Enterprise’s existing Anaconda Gathering System which gathers gas production from the Marco Polo area. The route is connecting the fields to Enterprise’s existing Anaconda Gathering System. The subsea pipeline is 32 Miles long and […]
[…]pipeline is a 70-mile, 16-inch line with a capacity of approximately 100,000 barrels per day that connects the fields with the Cameron Highway Oil Pipeline and Poseidon Oil Pipeline systems at Cameron Highway’s Ship Shoal 332B junction platform. Enterprise owns a 50 percent and 36 percent ownership interest in the Cameron Highway and Poseidon oil […]
[…]pipeline will have the capacity to transport up to 230,000 barrels per day of crude oil and will connect the field to the Cameron Highway Oil Pipeline and Poseidon Oil Pipeline systems at Enterprise’s Ship Shoal 332B junction platform. Enterprise owns a 50 percent interest in Cameron Highway and a 36 percent interest in Poseidon […]
[…]Izobilnoye to Dzhugba on the Black Sea Coast, a 235 mile section on the bottom of the Black Sea connecting Dzhugba to Samsun on the Turkish coast and a further 300 mile link from Samsun to Ankara. The route is in the Black Sea connecting Dzhugba to Samsun on the Turkish coast. The subsea pipeline […]
The Gas 2025 study identified Interconnector 2 (IC2) as the most practical solution to transport additional gas supplies to Ireland. IC2 now provides additional capacity to meet the substantial increase in gas demand forecasted for the coming decades.
Construction of IC2, a 195km sub-sea Interconnector pipeline linking Ireland with Southwest Scotland commenced in April 2002 […]
Offshore crude oil system that connects the Allegheny platform in the Green Canyon area of the Gulf of Mexico with Poseidon at the Ship Shoal 332 platform. The route is connects the Allegheny platform in the Green Canyon area of the Gulf of Mexico with Poseidon. The subsea pipeline is 43 Miles long and start […]
Offshore crude oil system that connects the Typhoon platform in the Green Canyon area of the Gulf of Mexico to the Shell Boxer platform, which provides access to Poseidon through a third party pipeline. The route is connects the Typhoon platform in the Green Canyon area of the Gulf of Mexico to the Shell Boxer […]