[…]designs, project work, specifications and tender documents, classification drawings, hull strength and optimising calculations, arrangement drawings, engine and piping arrangements, isometric drawings, stability- and tonnage calculations, inclining tests and certification of cargo gear.
Follow-up visits during shipyard constructions are standard, and a range of other consultancy services, such as shipyard negotiations etc. are available. Visit […]
[…]type of rig and is designed as a Samsung/Reading & Bates Samsung/R&B Falcon Double Hull and built by Samsung Heavy Industries at the Samsung Korea shipyard. The rig can be operated in water depths of 10,000 ft and drill down to about 30,000 ft. Drilling Rig Jobs and Careers Drilling Rig […]
[…]rig and is designed as a Samsung/Reading & Bates Conoco/Ready & Bates, Based on Double Hull Tanker and built by Samsung Heavy Industries at the Kyungnam, South Korea shipyard. The rig can be operated in water depths of 10,000 ft and drill down to about 30,000 ft. Drilling Rig Jobs and Careers Drilling Rig […]
[…]The Semisub is a Semisub type of rig and is designed as a Based on Sevan Stabilized Platform hull technology and built by Unkown. The rig can be operated in water depths of 12,500 ft and drill down to about 40,000 ft. Drilling Rig Jobs and Careers Drilling Rig […]
[…]& Wright/Sedco Arctic drilling vessel: inverted, truncated, conically shaped ice-strengthened hull and built by Mitsui at the Japan shipyard. The rig can be operated in water depths of 600 ft and drill down to about 20,000 ft. Drilling Rig Jobs and Careers Drilling Rig […]
[…]is a Drillship type of rig and is designed as a Samsung/Reading & Bates Saipem 10000, double hull, dual activity, EWT capability and built by Samsung Heavy Industries at the Kyungnam, South Korea shipyard. The rig can be operated in water depths of 10,000 ft and drill down to about 30,000 ft. Drilling Rig Jobs […]
[…]Driller. The Semisub is a Semisub type of rig and is designed as a Mariner Class – twin hull semisub column stabilized and built by at the Korean Shipbuilding Busan Korea shipyard. The rig can be operated in water depths of 600 ft and drill down to about 20,000 ft. Drilling Rig Jobs and Careers […]
[…]on the Frontier Driller. The Semisub is a Semisub type of rig and is designed as a Aker H-3 twin hull S1289 column stabilized semi-submersible and built by Rauma Repola Oy at the Rauma Repola Finland shipyard. The rig can be operated in water depths of 1,250 ft and drill down to about 25,000 ft. […]
[…]activity because it is placed on the seabed with steel legs that can be jacked up and down. The hull (rig) is jacked up to a safe height above sea level. The drilling rig type is very popular and it is believed to be over 500 in use worldwide. List of 10 Jackup Drilling Rigs […]
Rig for both Shallow and Deep Water Drilling Semisub is a floating installation used for drilling, completion and well service on the Norwegian and international shelf. The lower structure of the rig consists of floating elements (pontoons). The pontoons have tanks that can be filled with water (ballast) so that the center of gravity of […]
[…]An engineer is required to develop a detailed inspection scope for each of the FPSO’s 59 hull tanks to form the basis of the inspection workpack.
Based in Sunbury on Thames UK and reporting to the Asset Corrosion Engineer, the successful candidate will be responsible for developing the detailed inspection work pack for each tank ahead […]
[…]DB50 derrick barge in DP mode on August 1. After landing the oil/gas export catenary risers on hull porches, the deck was lifted onto the hull on August 8.
First oil was produced two months later, after the facility was abandoned three times for hurricanes, one of which passed directly over the platform. Time from project […]
[…]Ray McDermott’s fabrication and installation was completed in March 2001. The 14,500 ton TLP hull was constructed by Daewoo Shipbuilding. The hull was transported to the United States by Dockwise using the Mighty Servant 3. The complete TLP was installed on location June 20, 2001. Menck installed 12 piles for the TLP. Each pile is […]
[…]$1.0 billion. About 55% of the project costs were spent on the fabrication and installation of the hull, deck, facilities and pipelines. The other 45% of the project costs are to be spent on drilling and completion of the wells. Ten of the tension leg platform (TLP) development wells were predrilled using Sonat’s semisubmersible George […]
Genesis – the production facility comprises a floating cylindrical hull (SPAR) moored to the seabed with integrated drilling facilities and a capacity of 20 wells. Oil and gas is exported via a newly built 49-kilometre, 14-inch pipeline to the South Timbalier 301B platform where it joins a 24-inch trunkline to shore.
Developing the Genesis field began […]