Barracuda and Caratinga, Petrobras, - development project involved the construction, start-up, ownership and operation of deep-sea production facilities for the Barracuda and Caratinga oil fields, located in thecentral part of the Campos Basin.
The Barracuda and Caratinga field development by operator Petrobras is located BC-50B in Campos Basin offshore Brazil
in water depths of 1,035 meters
3,395 feet .
Petrobras with its partners started development of the Barracuda and Caratinga field in 1989.
The recoverable reserves are estimated to 1,229 mmboe. Number of subsea wells are 54. The production year is
1998 with a daily production estimate of 150,000 bopd. The Barracuda and Caratinga project is based on a
subsea solution with Barracuda and Caratinga FPSO topside solution. The development cost is in the order of $260,000,000 with an estimated field life of years.
Barracuda and Caratinga
Technical Information:
No of Wells:
54
Crude:
Water Depth:
1,035 meters
3,395 feet
Design Pressure:
Design Temperature:
Field Life:
Barracuda and Caratinga Project Status:
Daily Production: 150,000 bopd
Field Status:
Check back frequently for updated subsea oil and gas project info.
Barracuda and Caratinga information given here at the subsea oil and gas directory may contain errors, be incorrect, incomplete or not fully updated. Please
contact us or Barracuda and Caratinga projects to enable us to correct this.