Galley
- is a redevelopment of the block 15/23a Galley field – currently producing via a floating production facility
Operator: Talisman,
Location: Europe(North), North Sea, UK
Duart
- an eight-inch production line and a three-inch gas lift line to be installed to flow the field back to Tartan
Operator: Talisman,
Location: Europe(North), North Sea, UK
PM-3 Commercial Arrangement Area (CAA)
- Phases 2 and 3 of the PM-3 Commercial Arrangement Area (CAA) project are being carried out offshore Malaysia/Vietnam. Phase 1 oil production commenced in July 1997. Phases 2 and 3 achieved peak production early 2004.
Operator: Talisman,
Location: Asia, Indonesia, Malaysia