Vesterled Pipeline - Gas Pipeline System in North Sea
Vesterled pipeline system, operated by Gassco, runs from the Heimdal Riser platform in the North Sea to St Fergus in the UK with a length of 361 km in the North Sea
offshore Norway.
|
| Vesterled, North Sea |
Subsea Gas Pipeline Development Data: |
| Area: |
North Sea |
| Region: |
Europe(North) |
| Route: |
from the Heimdal Riser platform in the North Sea to St Fergus in the UK |
| Start Country: |
Norway |
| End Country: |
UK |
| Operator: |
Gassco |
| Partners: |
Total E&P UK, Gassco |
| Time of Start-Up: |
1978 |
| Development Cost: |
|
Vesterled Gassco pipelines, Gassco - The Vesterled system runs from the Heimdal Riser platform in the North Sea to St Fergus in the UK, is 361 kilometres long overall and has an internal diameter of 32 inches.
|
| Vesterled |
Pipeline Technical Specification: |
| Medium: |
Gas |
| Capacity: |
36 scm/d |
| Pressure: |
|
| Size: |
32 inches in diameter |
| Pipe Construction: |
|
| Pipelay Vessel(s): |
|
Vesterled Gas Pipeline Project:
Pipeline Status: In Operation
|
Check back frequently for updated subsea oil and gas pipeline info.
|
|
Vesterled information given here at the subsea oil and gas directory may contain errors, be incorrect, incomplete or not fully updated. Please