Europipe II Pipeline - Gas Pipeline System in North Sea
Europipe II pipeline system, operated by Gassco, runs from the Kårstø processing complex Dornum in northern Germany with a length of 658 km in the North Sea
offshore Norway.
|
| Europipe II, North Sea |
Subsea Gas Pipeline Development Data: |
| Area: |
North Sea |
| Region: |
Europe(North) |
| Route: |
from the Kårstø processing complex Dornum in northern Germany |
| Start Country: |
Norway |
| End Country: |
Germany |
| Operator: |
Gassco |
| Partners: |
Statoil, Gassco |
| Time of Start-Up: |
1999 |
| Development Cost: |
|
Europipe II Gassco pipelines, Gassco - The Europipe II pipeline is 658 kilometres long and has an internal diameter of 42 inches. It transports gas from the Kårstø processing complex north of Stavanger to the receiving facilities at Dornum in northern Germany.
|
| Europipe II |
Pipeline Technical Specification: |
| Medium: |
Gas |
| Capacity: |
56 scm/d |
| Pressure: |
|
| Size: |
42 inches in diameter |
| Pipe Construction: |
|
| Pipelay Vessel(s): |
|
Europipe II Gas Pipeline Project:
Pipeline Status: In Operation
|
Check back frequently for updated subsea oil and gas pipeline info.
|
|
Europipe II information given here at the subsea oil and gas directory may contain errors, be incorrect, incomplete or not fully updated. Please
contact us or Gassco pipelines to enable us to correct this.
|